Entries of August, 2011

Breaking News: Venture Named No. 1 Fastest-Growing in 2011 by PBT

By on August 26 2011 posted in Uncategorized with 0 comments

Venture Engineering & Construction is ranked the Number 1 Fastest-Growing Environmental/Engineering/Energy Company in Pittsburgh for the 2nd year! The Pittsburgh Business Times will be continuing to add information about the awards here.

Read more...

Civil Distribution Piping Design

By on August 24 2011 posted in Pipe Stress and Seismic Design, Projects with 0 comments

Location: Las Vegas, Nevada Date Completed: 2009 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted to provide mechanical and plumbing systems pipe stress and seismic analysis using an approved software called Coade Caesar II for the distribution network of the new Terminal 3 Site at the McCarran [...]

Read more...

Distribution Piping Design

By on August 24 2011 posted in Pipe Stress and Seismic Design, Projects with 0 comments

Location: Las Vegas, Nevada Date Completed: 2009 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted to provide mechanical and plumbing systems pipe stress and seismic analysis using an approved software called Coade Caesar II for the distribution network of the new Terminal 3 Central Plant and Tunnel [...]

Read more...

San Francisco Bay Bridge CFD Modeling

By on August 24 2011 posted in CFD Modeling, Projects with 0 comments

Location: San Francisco, California Date Completed: 2009 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted to provide a Computational Fluid Dynamics (CFD) Model for the welding processes for the Orthotropic Box Girders (OBGs) of the new Cable Stay Bridge from Treasure Island in the Bay Area to [...]

Read more...

Utility Power Reliability Study

By on August 24 2011 posted in Co-Generation, Projects with 0 comments

Location: Las Vegas, Nevada Date Completed: 2007 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted to provide a Utility Power Reliability and Demand Conceptual Study for the McCarran International Airport complex. The purpose of the study was to address the major factors and present design concept alternatives [...]

Read more...

RJC Emergency Piping Repairs

By on August 24 2011 posted in Piping Design & Analysis, Projects with 0 comments

Location: Las Vegas, Nevada Date Completed: 2009 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted to analyze and design the replacement of the Regional Justice Center Building underground energy distribution network including; chilled water, heating hot water, and tempering water piping with insulation jackets. The entire project [...]

Read more...

Caesars Palace HVAC Renovations

By on August 22 2011 posted in Hospitality, Projects with 0 comments

Location: Las Vegas, Nevada Date Completed: 2007 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted by Harrah’s Entertainment to provide construction documents and construction administration for the installation of new heating and cooling equipment for the Caesars Palace 29th Floor Palace Tower. As these suites on the [...]

Read more...

Atrium Suites Hotel Renovations Project

By on August 22 2011 posted in Hospitality, Projects with 0 comments

Location: Last Vegas, Nevada Date Completed: 2007 Project Scope Venture Engineering & Construction’s Las Vegas Office (formerly Loftus Associates West, LLC) was contracted to provide construction design documents for competitive bidding for the renovations of the Atrium Suites Hotel located on Paradise Road in Las Vegas, Nevada. The projects intent was to upgrade the hotel [...]

Read more...