6,000 SCFM Landfill Gas TO HIGH BTU FACILITY

Project Scope
Venture Engineering & Construction was contracted as Owner’s Engineer to provide process design and installation engineering, and procurement services for a 6,000 SCFM LFG to High BTU upgrade facility using membrane technology for CO2 rejection, and PSA technology for N2/O2 rejection. The product gas will be sold to the utility and introduced into the natural gas pipeline.

Services Provided
To date Venture has completed the process design tasks including the process modeling, development of PFD’s, P&ID’s, and has conducted a HAZOP study with the client and the major equipment vendors. Currently, Venture is finalizing the detail design and installation drawings that will be used in the contract bidding and construction process where Venture will provide engineering and commissioning support services.

* Process Modeling
* Process Flow Diagrams (PFD’s)
* Piping and Instrument Drawings (P&ID’s)
* Instrument Data Sheets
* Equipment Specification development
* Equipment Submittal Review
* Equipment Selection
* Detail Design
* General Arrangement
* Piping
* HVAC
* Civil
* Structural
* Electrical
* Instrumentation & Controls
* Commissioning services
* Personnel training
* Start up services