Entries in Category ‘Projects’

Digester Gas High BTU Processing Plant

Date Completed: 2009 Project Scope Venture Engineering & Construction was contracted to provide engineering and design services for a new 350 SCFM bio-digester gas to high BTU gas plant for the Vancouver Municipal Water Authority, in conjunction with QuestAir Technologies. This plant includes a 100% skid fabricated design concept. Engineering was finalized in early 2009, […]

Read more...

Coleman Station Fuel Gas Desulfurization Electrical Power Distribution

Location: Coleman Station Date Completed: 2008 Services Provided Venture Engineering & Construction was contracted to provide the following services: Short circuit and relay coordination study (ETAP Power Station) of new 12.47 kV, 4.16V and 480V equipment for the fuel gas desulfurization power system. Motor starting study to determine the feasibility of starting 2000HP fans, 1400HP […]

Read more...

LFG to Energy Complex Process Evaluation

Location: Altamont, California Date Completed: 2010 Project Scope Venture Engineering & Construction was contracted to provide, under its Master Service Agreement, a process review of the existing Altamont Landfill Gas to Energy complex. The study was intended to identify potential process improvements to reduce or eliminate the need to burn supplemental fuel at the existing […]

Read more...

Structural Engineering Study

Location: Claremont, New Hampshire Date Completed: 2009 Project Scope Venture Engineering & Construction was contracted to provide a structural engineering study on feasibility of adding 20 foot vertical sections to two similar (but opposite-hand) conditioning towers and associated inlet ductwork and support structures. Services Provided Venture performed framing analysis using STAAD-Pro structural analysis and design […]

Read more...

Emissions Control Project – Waste-to-Energy Plant

Location: Millbury, Massachusetts Date Completed: 2009 Project Scope Venture Engineering & Construction was contracted to provide project development services including scoping and estimating through installation engineering. The facility burns municipal waste in two 750 ton per day refuse boilers and generates 40 MW of electrical power. To improve air quality, the existing electrostatic precipitators were […]

Read more...

Structural Engineering Feasibility Study and Estimate

Location: Peekskill, New York Date Completed: 2008 Project Scope Venture Engineering & Construction was contracted to provide an additional conceptual structural engineering feasibility study and estimate to determine the structural and economic feasibility of building a new Storage and Maintenance Building atop an existing Maintenance Building where the Electrostatic Precipitator boxes and their support steel […]

Read more...

Estimate and Structural Engineering Study

Location: Peekskill, New York Date Completed:2009 Project Scope Venture Engineering & Construction was contracted to provide an estimate and structural study to complete an installation of three bypass ducts above three existing, but out-of-service, electrostatic precipitators. The precipitators were designed and installed by Wheelabrator APC in the early 1980s to provde air pollution control for […]

Read more...

Power Plant Modeling – 1500 TPD Waste-to-Energy Plant

Location: Maryland Date Completed: 2008 Project Scope Venture Engineering & Construction was contracted to provide steam cycle analysis using the Thermoflex modeling software for a new 1500 TPD MSW to energy plant. The scope included modeling an existing facility for baseline verification and then applying the model to the planned 1500 TPD plant. Modeling included […]

Read more...

Calgon Carbon Big Sandy Plant

Location: Big Sandy, Kentucky Date Completed:2010 Project Scope Venture Engineering & Construction was contracted to provide a study to examine options available for reclaiming heat used in the production of electricity through heat recovery high pressure steam generation and a steam turbine driven electric generator. Calgon carbon has three production lines in operation at its […]

Read more...

Biodiesel Plant Gap Analysis

Location: Date Completed: Project Scope Venture Engineering & Construction was contracted to perform a gap analysis to identify missing equipment and equipment requiring repairs. The analysis provided a cost estimate of what would be required to allow the skids to be in full working order. It also identified additional settlers required to improve product separation […]

Read more...