Digester Gas High BTU Processing Plant

Date Completed: 2009

Project Scope
Venture Engineering & Construction was contracted to provide engineering and design services for a new 350 SCFM bio-digester gas to high BTU gas plant for the Vancouver Municipal Water Authority, in conjunction with QuestAir Technologies. This plant includes a 100% skid fabricated design concept. Engineering was finalized in early 2009, and construction and commissioning was finalized in Q4 2009.

Services Provided
Venture provided the following services:

  • Front end engineering design, including capital cost estimate
  • Installation engineering and design, including skid fabrication drawings
  • Skid fabrication (subcontractor)
  • Equipment sizing, design and procurement
  • PLC programming
  • Commissioning and start-up